Showing posts with label Adding notes. Show all posts
Showing posts with label Adding notes. Show all posts

Saving Extra Information – hyperlinking and attaching documents


It is sometime required that you save more information about a task or link some documents to your task that make your job much easier.

To save notes for task, double click a task and in task information dialog box click notes.
In our scenario we want to keep note of what manual task we need to track, lets make note of it and save it.

Adding Notes
Adding Notes
The MS Project will indicate small note icon next to task, indicating it has some notes.

Task with Notes
Task with Notes

When you mouse over the note icon, MS project will show the quick popup with note, very useful feature to quickly give you hint what you want to meant by it.

Quick pop up on Note icon
Quick pop up on Note icon
Now let us assume that you want to save the complete checklist while you create the Design.
To add document in project that can be saved inside the project file and move with it, you can do this by following same method as above and click on Insert Object button.

Insert Object
Insert Object

From popup window either create new document or select from file.

Insert Object
Insert Object
If you don’t want directly the content to be added from document, click on the Display as icon check box.

Now some time it doesn’t make sense to include complete document to your MS project file as this will increase the overall project file size. To save the link of document to your task, right click on your task and select hyperlink from menu.

Add Hyperlink
Add Hyperlink

In Insert Hyperlink select the file or provide web address, enter text to be shown when you hover your mouse on link also you can show additional tip using screen tip button. 

Adding link
Adding link
You will see that MS Project adds hyperlink icon next to your task and now you can hover your mouse to see the desired information.

Task with hyperlink
Task with hyperlink